Repowering

RePowering

[RePowering] Reinstallation after collecting the existing panels from solar power plants

Repowering
  • We replace solar power equipment with 20-30% less efficiency with high-efficiency modules to ensure higher profitability.
  • Solar power plant repowering empowers us to achieve a higher output and a stable system, leading to even greater profits.
RePowering process
Permit review
  • If the power generation capacity is less than 10%: Pre-use inspection / Construction plan modification

On-site inspection
Determine the scope of work
  • Demolish and replace the existing equipment part
  • Completely demolish and replace the existing equipment
  • Full capacity of the power plant
Propose quotation
  • Cost of the demolishing modules, inverters, etc.
  • Cost for new installation
  • Review/submit a quotation
Sign a contract
  • Confirm the total contract price
  • Confirm the construction period
  • Sign a construction contract
Install and construct
  • 73.5kW at the Cheongju Agricultural Technology Center
  • 25kW at the Administrative Welfare Center, Osong-eup, Cheongju
  • 10kW at the Administrative Welfare Center, Namil-myeon, Cheongju